Sign up for our latest offers
Newsletter
By submitting your details you consent to their use in accordance with our Privacy Notice
At Cadmus Products we aim to deliver orders efficiently and at highly competitive rates.
The Cole Parmer Spirit Filled Thermometer is designed for the Stuart SMP11 Analogue Melting Point Apparatus by Cole Parmer has a maximum temperature of 250°C. Three samples can be tested simultaneously for increased productivity. Instructions for operation are detailed on the front of the instrument. Place your sample capillary tube into the aluminium block, set the heating rate using the analogue control knob between 1°C and 20°C. Lower the heating rate as the melting point is approached between 1-10°C, which will give better accuracy within 1°C of the melt temperature.
Integral LED illumination and magnifying lens make viewing easyTake melting point measurements of up to three samples at once for greater efficiency. Simple to operate, the instructions are printed directly on the unit. Place your sample in a capillary tube and insert it into the aluminum block. Manually set the heating rate between 1°C and 20°C per minute, up to a maximum of 250°C. Lowering the heating rate as you near the expected melting point temperature will increase the accuracy of the reading. Observe the sample through the magnifying lens until the melt occurs and read the melt temperature from the thermometer.
Apparatus is supplied with open-ended capillary tubes. One end should be sealed with a Bunsen burner; or purchase optional capillary tubes separately that are already sealed. Order the optional brass cooling plug to speed up cooling when multiple runs are needed.
SKU | Description |
SMP11 | Melting point Apparatus, complete with thermometer and pack of 100 melting point tubes (open both ends) |
SMP11/1 | Spare thermometer, spirit filled, 50°C to 250°C |
SMP1/1 | Spare thermometer, 0°C to 360°C |
SMP1/2 | Cooling plug (brass) for rapidly reducing heating block temperature after use |
SMP1/4 | Glass melting point tubes, open at both ends, pack of 100 |
SMP2/1 | Glass melting point tubes, closed at both ends, pack of 100 |
Note: This product currently has a lead time of 2-3 days.
By submitting your details you consent to their use in accordance with our Privacy Notice